How to ask Load Factor questions that come back precise, complete and citable, and what the data does and does not cover.

Your assistant turns your question into tool calls, so the clearer the question, the better the calls. This page shows how to phrase questions that get precise answers, and explains the definitions and coverage limits worth knowing before you quote a number.

## Name the scope

Say which market, place, technology and size you mean. Each one becomes a filter.

| Instead of | Ask |
|---|---|
| "Show me solar projects" | "List solar projects over 200 MW in the ERCOT queue" |
| "Who's big in storage?" | "Rank the top 10 developers of battery storage projects in the CAISO queue" |
| "What's near this site?" | "What substations and pricing nodes are within 15 miles of project J1229?" |
| "PPA prices?" | "What do wind PPAs sell for in PJM, by year?" |

Useful filters: ISO (PJM, MISO, ERCOT, SPP, CAISO, NYISO, ISO-NE and more), state and county, fuel (Solar, Wind, Battery Storage, Hybrid and more), size in MW, queue dates, and queue status.

## Ask for counts, tables and totals

Queue and plant tools return totals over every match, not only the rows shown, so ask for counts and capacity directly ("how many", "how much MW", "by ISO"). Ask for a table when you want to compare. For long lists, ask for the next page rather than a bigger one.

## Ask for evidence and project numbers

Every developer attribution in Load Factor has a confidence level and evidence behind it. Ask for both:

- "Include the confidence level and the strongest evidence for each developer."
- "Show project numbers and links so I can check them."

Each evidence record carries its source as the web app names it and a strength word (Strong, Supporting or Lead), so you can ask for "only Strong evidence" or "evidence from federal filings". See [Evidence sources and strength](https://loadfactorenergy.com/developers/tools#evidence-sources-and-strength).

Then follow up by project number, company name or plant id: "Tell me more about J1229", "Profile the developer of that project", "Who buys power from it?"

## Say which status you mean

Queue status changes what is counted:

| Status | Means |
|---|---|
| `live` (the default) | Not withdrawn or suspended. **Includes projects that are already operating.** |
| `in_queue` | The development pipeline: not withdrawn and not yet operating. |
| `operating` | In service. |
| `withdrawn` | Withdrawn, suspended or cancelled. |
| `all` | Everything. |

"How many projects are in the pipeline?" is an `in_queue` question. Summaries say how many live projects are already operating.

## Know what "two sources agree" means here

Load Factor's MCP tools say a developer's badge in its basis words, the same ones the web app shows: **Two sources agree** (two or more independent strong records name it), **Named in the queue**, **Inferred** or **Not identified**. A developer is **not** counted where two sources agree when the name comes only from the interconnecting utility in the queue ID, from an automatic EIA-860 owner match, from an automated promotion by Load Factor's resolver, from a single weak source, or from a row flagged in quality checks. Each row carries a confidence label that says which case applies.

Company names are shown as recorded, including SPV and LLC names. A parent company is named only when Load Factor has verified it; other parent links are labelled inferred or left out.

## What the data covers

- **Queue projects** are renewable only: solar, wind, storage, hybrid, hydro, geothermal and bio-energy. Withdrawn projects are left out unless you ask for them.
- **Queue status** reflects each ISO's latest snapshot, so some active projects may have withdrawn since.
- **Capacity**: West, Southeast and CAISO queues report MW in size buckets. PJM's MW is capacity interconnection rights, which for solar and wind is below nameplate.
- **Operating plants** come from EIA-860 and EIA-923. They are a national reference layer and are not limited to your ISOs; queue projects linked to them are.
- **PPA prices** come from FERC Electric Quarterly Reports. ERCOT has no EQR data.
- **Nodal prices** are a one-day snapshot, not a history, and PJM prices are not loaded.
- **Permits** cover Virginia SCC filings; **transmission plans** cover MISO's long-range plan; **distributed generation** covers New York.
- **Personal information** is withheld for everyone: landowner names and land-record details, e-mail addresses, phone numbers, street addresses and names of individuals in evidence.

Ask "What data does Load Factor have on queue projects, and how fresh is it?" to have the assistant check coverage and dates with `data_catalog`.

## Small habits that help

- Start a prompt with "Using Load Factor" so the assistant uses the connector.
- Ask the assistant to pass on the caveats each tool returns.
- If a result looks filtered or empty, ask "What can I access through Load Factor?": the answer shows your ISOs and the tools your plan includes.